Case Study: Olympic Velodrome

The last surviving site of the 1948 London Olympic Games, and a project funded by the National Lottery.

Alroys used galvanised, hot-dipped Steel to fabricate ascending safety hand rails for the velidrome. The hand rail was measured, fabricated in accordance with EN1090-2 standards, and installed by Alroys. Compliant with all necessary standards and CE approved for safety, strength and quality.

Using the same materials, Alroys provided the 6 metre rolling doors and bin cupboard.

See pictures below